Public stations · AFDC
EV charging in California
20,722 public EV charging sites in California in the AFDC snapshot, including 2,784 with DC fast charging. A site can be both DC fast and Level 2, so those two counts can overlap. Connector counts overlap for the same reason.
Connectors
| AFDC code | Meaning | Sites listing it |
|---|---|---|
| J1772 | J1772 (AC) | 17,675 |
| J1772COMBO | CCS (DC) | 2,079 |
| TESLA | NACS (J3400, AFDC code TESLA) | 1,914 |
| CHADEMO | CHAdeMO (DC) | 1,116 |
| NEMA520 | NEMA 5-20 | 19 |
| NEMA1450 | NEMA 14-50 | 17 |
| NEMA515 | NEMA 5-15 | 6 |
| J3271 | MCS (J3271 DC) | 2 |
Labels follow the AFDC station API field list. TESLA in that file is NACS (J3400).
Networks
| Network | Sites |
|---|---|
| ChargePoint Network | 14,724 |
| Tesla | 701 |
| Non-Networked | 648 |
| Blink Network | 602 |
| LOOP | 591 |
| Tesla Destination | 590 |
| FLO | 442 |
| eVgo Network | 397 |
| Electrify America | 333 |
| AMPUP | 313 |
| EVCS | 194 |
| POWERFLEX | 171 |
Cities
- Los Angeles : 2,120 public sites, 82 with DC fast.
- San Diego : 949 public sites, 95 with DC fast.
- Irvine : 800 public sites, 28 with DC fast.
- San Jose : 671 public sites, 67 with DC fast.
- San Francisco : 575 public sites, 41 with DC fast.
- Sacramento : 499 public sites, 55 with DC fast.
- Santa Clara : 393 public sites, 9 with DC fast.
- Menlo Park : 323 public sites, 32 with DC fast.
- San Mateo : 286 public sites, 14 with DC fast.
- Oakland : 264 public sites, 12 with DC fast.
- Anaheim : 261 public sites, 27 with DC fast.
- Santa Monica : 254 public sites, 10 with DC fast.
Source: U.S. Department of Energy, Alternative Fuels Data Center, retrieved November 19, 2026. Station locator. Query shape, without a key: https://developer.nlr.gov/api/alt-fuel-stations/v1.csv?fuel_type=ELEC&country=US&status=E&access=public&limit=all.
California: charging enrichment blocks
Sourced numbers carry a link and an accessed date, and figures we calculated, such as EVs per public port, are labeled as our arithmetic. This content describes rates and programs for information only. It contains no vehicle price advice.
Ranking: California is number 1 among U.S. states by electric vehicle registrations, with 1,843,100 registered through 2025 (DOE Alternative Fuels Data Center, Vehicle Registration Counts by State, 2025 data year, Electric (EV) column; Accessed Nov 19, 2026). AFDC notes that the National Laboratory of the Rockies derives the counts from Experian data, rounds them to the nearest 100, and counts light-duty vehicles registered through the selected year.
1. Electric utilities: EV and time-of-use residential rates
Rates change often, so each row shows the date on the tariff or page we read. All figures are cents per kWh for customers who buy both delivery and generation from the utility, before taxes. Customers of a community choice provider pay a different generation price.
| Utility | Plan | On-peak | Off-peak | Effective date | Source |
|---|---|---|---|---|---|
| Pacific Gas and Electric (PG&E) | EV2-A (whole-home EV time-of-use) | Peak 4 to 9 p.m. daily: 53.809¢ (summer, June 1 to Sep 30), 41.099¢ (winter, Oct 1 to May 31). Part-peak 3 to 4 p.m. and 9 p.m. to midnight: 42.760¢ summer, 39.428¢ winter | 22.558¢, midnight to 3 p.m. daily, all year | Total bundled rates effective March 1, 2026 (Advice 7846-E). The unbundling sheet in the same file is dated June 1, 2026. | PG&E tariff, Schedule EV2; PG&E EV rate plans. Accessed Nov 19, 2026. |
| Southern California Edison (SCE) | TOU-D-PRIME | Summer (June to Sep) weekdays 4 to 9 p.m.: 61¢. Summer weekends 4 to 9 p.m. (mid-peak): 39¢. | Summer: 26¢ in all other hours. Winter: 30¢ from midnight (the later winter periods were not captured) | Not stated on the page | SCE, Electric Vehicle rate plans. Accessed Nov 19, 2026. |
| San Diego Gas & Electric (SDG&E) | EV-TOU-5 | Summer 80.205¢, winter 52.383¢ | Off-peak: 49.627¢ summer, 46.566¢ winter. Super off-peak: 13.090¢ summer, 12.332¢ winter | Effective August 1, 2026 | SDG&E EV-TOU-5 total rates table (PDF). Accessed Nov 19, 2026. |
Notes. PG&E EV2-A adds a daily base services charge of $0.19713, $0.39688 or $0.79343 depending on income tier, and the plan is not available to customers using more than 800% of baseline over 12 months. SCE TOU-D-PRIME adds a $0.79 per day basic charge and has no baseline credit, and enrolling requires attesting that you have an EV, home battery or heat pump. SDG&E EV-TOU-5 adds a $0.79343 daily base services charge and needs an EV registered with the California DMV.
2. Current state and utility rebates and incentives
Used EVs (the part that matters most for a used buyer)
- SCE Pre-Owned EV Rebate. $1,000 for any SCE residential customer who buys or leases an eligible pre-owned battery-electric or plug-in hybrid, or $4,000 ("Rebate Plus") if income-qualified. Apply within 180 days of the sale. The vehicle must stay registered in California for at least 20 months, and the vehicle's price must exceed the rebate. A used car counts if it has more than 7,500 miles, or if it was fully registered to a previous owner and the contract says "Used". Status: listed as open on the program page; Accessed Nov 19, 2026. SCE program details.
- SDG&E Pre-Owned EV Rebate. $1,000 or $4,000 based on household income, apply within 180 days of purchase or lease. Status: listed on the SDG&E page; Accessed Nov 19, 2026. SDG&E EV incentives.
- PG&E Pre-Owned EV Rebate. Per PG&E's FAQ, a complete application for the standard rebate had to be in by November 11, 2026. Starting November 12, 2026, only income-qualified customers are eligible. Beginning July 30, 2026, new applications must be submitted within 90 days of purchase or lease (it had been 180 days). The FAQ says applicants approved for the $4,000 rebate can use that approval as income proof for the charging rebate. PG&E FAQ; Accessed Nov 19, 2026.
- Driving Clean Assistance Program (DCAP). SDG&E's page says it can provide up to $7,500 toward a new or used EV for program-qualified community members. Source: SDG&E EV incentives; Accessed Nov 19, 2026.
- Clean Cars 4 All, San Diego. Scrap-and-replace program with incentives up to $12,000 for eligible applicants, per the same SDG&E page.
Home charger and other incentives
- PG&E offers a residential EV charging rebate that can be stacked with its pre-owned rebate (PG&E FAQ).
- SCE lists a make-ready or pre-wiring rebate for chargers in the AFDC utility directory (AFDC utility incentives).
- State-level and air-district programs (for example, in the San Joaquin Valley and the South Coast) are listed on the AFDC California state page.
Federal note: the IRS says the Previously-Owned Clean Vehicle Credit is not available for vehicles acquired after Sep 30, 2025 (IRS, Used Clean Vehicle Credit; Accessed Nov 19, 2026).
3. Charger network mix (AFDC station data)
Query date: Nov 19, 2026 (Eastern time). Source: AFDC Alternative Fuel Stations API, electric (ELEC) stations with status open and access public. The API said its data was last updated Nov 19, 2026 at 14:52 UTC. The counts match the AFDC Alternative Fueling Station Counts by State table for this state (Accessed Nov 19, 2026).
| Network | Stations |
|---|---|
| ChargePoint | 14,724 |
| the largest automaker-run fast-charging network | 701 |
| Loop | 591 |
| Blink | 602 |
| stations not on any network | 648 |
Derived figure (our arithmetic, not an AFDC number): California has about 26 registered electric vehicles per public Level 2 or DC fast port, using 1,843,100 EV registrations (AFDC, 2025 data year; Accessed Nov 19, 2026) divided by 69,823 ports. Home charging, private stations and out-of-state drivers are not counted, so read it as a rough sense of scale, not a wait-time estimate.
4. Apartment and condo charging rules
- Owners in condos, co-ops and planned communities: California law says a common interest development may not prohibit or restrict installing or using an EV charger in the owner's designated parking space, though it can set reasonable restrictions that do not significantly raise the charger's cost or lower its performance. The owner must get approvals, use a licensed contractor, carry insurance and pay for the electricity. Cites California Civil Code 4745 (statute; AFDC summary). Accessed Nov 19, 2026.
- Renters: a landlord must approve a written request from a tenant to install a charger at the tenant's assigned parking space on qualified properties, with certain exclusions. The tenant pays for installation, electricity and removal, and may need liability insurance. Cites California Civil Code 1947.6 and 1952.7 (statute; AFDC summary). Accessed Nov 19, 2026.
Not legal advice. Statute summaries come from AFDC and the statute citations given. Read the statute before relying on it.